Vietnamese |  English |  中文 |  Báo In

Education infrastructure in Thuan An Town to be newly constructed and expanded

Update: 22-02-2019 | 11:56:39

In recent years, in order to meet the needs of schools for pupils, contributing to improving the quality of education, Thuan An town has prioritized resources to expand and build new schools in the area.

Nguyen Trung Truc Secondary School (Thuan An town) has just been built and put into operation in the 2018-2019 school year, contributing to ensuring the learning of their children in the area. Photo: Anh Sang

Prioritize resources to build schools

In the 2018-2019 school year, in Thuan An town, there are 123 schools (including 54 public schools) with 99,249 students, increasing 9,074 students compared to the previous school year. The increase in the number of students arranged by the town ensures that all children of all ages can go to school. In 2019, the town has 6 new construction schools, such as An Phu 2 Primary School, An Thanh Primary School, Binh Chuan Secondary School ... These projects are currently in the stage of drawing drawing design. public estimation.

Mr. Nguyen Xuan Khoi, Head of the Management Board of Thuan An town's construction investment project, said that in recent years, Thuan An is one of the localities with high mechanical population growth. It can be seen that the formation of industrial zones in the town has attracted a large workforce from provinces and cities throughout the country to work and live; the increase in labor force leads to a rapid increase in the number of students.

In order for workers to feel comfortable working and living in the town, the issue of meeting the demand for school children for workers is very important for the locality. In order to solve this problem well, in recent years, the town has prioritized resources to expand and build new schools in the area.

At the end of 2018, Thuan An town has started the construction of 5 schools, including Nguyen Truong To High School, Trinh Hoai Duc High School (renovating, upgrading and expanding the quality of Trinh Hoai Duc High School project. high), Hoa Mai Kindergarten. These projects are expected to be completed in 2019. Besides, in 2018, the town has put into use two works: Nguyen Trung Truc Secondary School and the open project of extending Trinh Hoai Duc secondary school.

Calling for socialization of education investment

Based on the achieved results and limitations and difficulties in 2018, Thuan An Town People's Committee has set up the main objectives and tasks in 2019. Accordingly, the town focuses on implementing effectively. results of guidelines and policies on investment; prioritize investment in construction of urban infrastructure development projects; promote calls for investment in the form of socialization, especially in the areas of education - training, health, culture, physical education - sports and tourism. Besides, the town continues to carry out key projects that the Resolution of the Party Congress of the term 2015-2020 has proposed; at the same time prioritizing the work of urban embellishment, striving to meet the urban criteria of grade II.

At the same time, the town is interested in allocating capital for transition projects; invest in education to solve student overload. The town also continues to develop education and training towards standardization and modernization; Encouraging and strengthening socialization in education work to create conditions to increase investment capital for education.

In 2018, the plan to adjust public investment of Thuan An town was 454,947 billion VND a 73 projects. Estimated disbursement value of public investment projects in the last year was VND 430.408 billion, reaching 94.61% of the plan; in which, provincial capital is managed and supported, decentralized capital is estimated to reach 100% of the plan, construction lottery capital is estimated at 80.05% of the plan. For works using the town's salary reform fund, in 2018, the disbursement value is estimated at VND 75 billion, reaching 100% of the plan.

In 2019, the total public investment plan of Thuan An town was arranged with VND 264,823 billion a 60 projects; total plan of using salary reform capital to arrange 106.7 billion VND a 14 list of works, of which education sector is 48 billion VND a 2 works, urban embellishment area is 58.7 billion VND a 12 works.

Reported by Phuong Le – Translated by Vi Bao

 

Share
Tags
Thuan An
Quay lên trên