Environmental protection infrastructure at Uyen Hung IC, VSIP II under supervision

Friday, 19/09/2014

The delegation was inspecting a waste water treatment work at VSIP II

According to representative of Binh Duong Forestry Products and General Import Export Joint Stock Company, the investor of Uyen Hung IC, the project of Uyen Hung IC has a total area of 122.2 hectares. The company has so far fulfilled its traffic, water drainage and lighting systems with the rate of land tenancy reaching 91.6% of total area. Especially, the company has completed the IC’s concentrated water treatment plant in the phase 1 with a capacity of 1,500 cubic meters per day…

*The same day, the delegation also monitored over the implementation of environmental protection infrastructure investment at Vietnam-Singapore II Industrial Park (VSIP II) invested by the VSIP Venture Co.Ltd.

So far, VSIP II has perfected its waste, rain water drainage and traffic systems. The company has also fulfilled the phase 1 of the VSIP II’s waste water treatment plant with a capacity of 6,000 cubic meters per day.

Mr.Nam spoke highly of environmental protection done by the investor of VSIP II. According to him, there was a synchronous investment on environmental protection infrastructure at VSIP II with inspection task regularly done…

Reported by Phuong An-Translated by K.T