Early December 11, provincial leaders and representatives from departments attended a review on 15 sophisticated models and draft drawings of D War-base proposed by sculptures. Chair of Provincial People’s Committee, Mr. Le Thanh Cung called for assurance of historical features and revolutionary traditions.
Provincial leaders have a look on the models After deciding on models of Monument of D War-base, the participants voted out 3 best suitable models to be developed into real construction. As estimated, the construction to re-feature D War-base is cost over VND 160 billion, of which VND 25-30 billion is reserved for the monument.Reported by B.Minh – Translated by Vi Bao