Thu Dau Mot town projects management board has launched to build a system of water inlet sluice on Thich Quang Duc road. According to an inspection unit, it is likely to build another item with a total length of 110m to solve water drainage issue.
Cong T-junction area linking with Thich Quang Duc and Phan Dinh Giot roads often occurs flooding after heavy rains. The local residents hope that the work will minimize the current flooding.
Reported by D.Khang – Translated by A.C