Early May 23, Tan An Ward organized an inauguration ceremony for Cau Tre construction at Quarter 4 of Tan An Ward. The construction is a bridge of 38 meters long and capacity of 2.5 tons, constructed by steel reinforced concrete pillars to support 9 spans and 2.3m wide surface of 3mm steel plates welded and fixed by nuts. At both ends of the bridge the leading paths are constructed by concrete flooring. Total cost of the construction is estimated at VND 520 million sponsored by Thyeming Vietnam and under workmanship of Quang Khoi Co. Ltd.
Cau Tre is of practical use for daily travel of locals and creating new appearance of urbanization locally.
Reported by K. Chi – Translated by Vi Bao